Greenwich Millennium Village phase 1 C,D and E

Greenwich Millennium Village

Greenwich Millennium Village

Contact

Philip Wilkinson. Ramboll

Philip Wilkinson

Director, Buildings
T: +44 7736 056 610

Stepan Ruzicka

MSc PhD CEnv MCIWEM, Director, Environment and Health
T: +44 2076 315 291
Philip Wilkinson. Ramboll

Philip Wilkinson

Director, Buildings
T: +44 7736 056 610
An award-winning scheme, these new dwellings constitute Phase I of a larger development — Greenwich Millenium Village. This includes a variety of residences, a school, parkland, waterways and a football pitch. The buildings in Phase I provide a major proportion of the affordable housing for the project.

Holly Court (otherwise known as Phase IC) consists of two ten storey concrete frame buildings, both L-shaped in plan, enclosing a central courtyard. The upper storeys of each building are stepped back from the elevation The roof is a steel barrel-vault.

Due to site contamination, digging a basement was not an option, so indoor car parking is provided on the ground floor. This contributed to our challenge of maximizing the total number of storeys within a 30m planning restriction on building height.

Our solution includes a transfer structure that minimizes use of vertical space. We used transfer beams with upstands concealed within the walls of the floor above, obviating the need for a deep transfer slab.