Projects

We have solved many distinctive and challenging projects for our customers. Here you can read more about some of the projects we are currently involved in worldwide or look trough our project database.


The UN-House. UNEP/GRID Headquarter - “Green” office building

The UN House is the center for United Nations Environment Program in Norway and is located on the seafront of Arendal city.

Shelter building for the Arctic Sealing Ship “Aarvak

Rambøll Architects have designed this outstanding shelter building in connection with the Arctic Museum Aarvak in Brandal on the west coast of Norway. The contract was allocated after winning a closed design competition.

Z-huset

Z-huset is a visionary architectural statement. With its descending heights and open courtyards, the remarkable geometry of the building ensures natural light and a view of the astonishing surroundings at the Port of Aarhus.

The Wall of Dreams

Public housing area Gadekærvej in Valby, Copenhagen is undergoing a major renovation, which amongst others includes the construction of a 600 m2 LED lit poem embedded in the house-ending wall. The art piece has been developed in a partnership between the area residents, poet Morten Søndergaard and Ramboll Lighting. The art piece has been named ‘The Wall of Dreams’ and was inaugurated in May, 2015.

Haukeland hospital in Bergen

The new center for children and youth at Haukeland hospital in Bergen will hold a high international standard, and create an inspiring and functional environment for both patients, relatives, employees and students.

Norway's largest dairy

Ramboll has been the architect for the 25,000m2 dairy in Jæren in the county of Rogaland. Not only is the new dairy Norway's largest, but it is also one of the most advanced in Europe.

Uniting the production of poultry

Uniting two poultry factories to the biggest poultry factory in Scandinavia.

Haldor Topsoe Impregnation Plant China

The factory, which is the first factory on Haldor Topsoe site in Tianjin, China, comprises a production building of 6,000 m2, a warehouse building of 8,500 m2 and an administration building with offices, canteen, kitchen and locker rooms, total area 1,000 m2.

Scania Regional Production Centre

Greenfield development of 38 acre site for establishing assembly and production facilities for trucks and buses.

Parkbygget - Haukeland University Hospital

Bergen Health and Haukeland University Hospital have built a new Centre for Nuclear Medicine/PET with an associated Polyclinic and patient ward. The building is placed in the hospital park and has therefore been given the name “Parkbygget”, which in Norwegian means Park Building.

Grundfos Manufacturing Serbia - GMS 1

The factory, which is the first factory on Grundfos 150,000 m2 site in Indjija, Serbia, comprises a production and warehouse building of total 18,000 m2.

Ras Laffan port expansion

Ramboll provided the Front End Engineering Design (FEED) for Phase 2 of the Ras Laffan Port Expansion Project.

New Ducab Headquarters Dubai

Ramboll was appointed as the Lead Consultant to provide fully multi-disciplinary architectural and engineering design services for the extension of existing facilities of Dubai Cable Company (Ducab) in Jebel Ali, Dubai.

New Ny Krohnborg

Rambøll has in collaboration with the architect group Cubus been commissioned by Bergen municipality to carry out overall planning of a new district center at Damsgård.

The Delta Neighbourhood in Vinge, Denmark

Planning new town near future S-train station The Delta Neighbourhood will be the first development of the new town Vinge, Denmark. The neighbourhood consists of 500-600 houses located close to a future S-train station and close to the surrounding nature.

Thermoform Factory in Liberec, Czech Republic FPCZ-I

The FPCZ-I factory on Faerch Plast's 10 ha site in Liberec comprises a 2-3-storey 2, 250 m2 support building including 650 m² offices, a 150 m2 container building and a 11,350 m2 production building including storage area.

Heimdal High School, Norway

The new Heimdal High School (VGS) is the largest zero emissions building in Norway and one of the most environmentally friendly school facilities in the world – and precisely consideration for the environment was an ambition right from the beginning of the project process.

Husnes music and culture center

The extension of the culture school is placed neighbouring the existing culture house in Husnes, Norway.

Lynetten

Facade lighting for sludge incineration plant "Lynetten" in Copenhagen, Denmark

Grundfos - new electronic production facility

Establishing a new electronic production facility in an existing production hall.

Greenfield Production Facility for Bang & Olufsen, Czech Republic

Bang & Olufsen, the manufacturer of high quality audio-visual technology, decided to place their only foreign production facility in Koprivnice in North Moravia. The company invested EUR 16.5 million in the construction of a new factory employing up to 200 workers. Ramboll acted as General Planner on the project.

Greenfield Production Facility for Grundfos

Grundfos is one of the world's leading pump manufacturers. When the existing acquired production facility in Suzhou became too small to supply pumps to the rapidly growing Chinese market, Grundfos purchased a new site in the amazing Suzhou Industrial Park for a new greenfield production facility. Ramboll acted as General Planner on the project.

Greenfield Steel Service Centre for Ib Andresen Industri

Ib Andresen Industri A/S is a specialist subcontractor to Danish and non-Danish companies within the working and processing of steel and metals. As part of an internationalisation process, the company decided to build a new steel service centre in Györ, Hungary, offering coil warehousing as well as slitting and cutting of coils. Ramboll acted as General Planner on the project.

Greenfield Production Facility for Faerch Plast

The desire to increase their range of distribution was the principal reason behind Faerch Plast's decision to locate their first production facility outside Denmark in the Czech Republic. The new location provides proximity to the rapidly growing markets in Central and Southern Europe. Ramboll was assigned as General Planner.

Greenfield Production Facility for Coloplast, phase 1 to 3, Hungary

When Coloplast decided to establish their first production facility outside of Denmark, the aim was to reduce production costs while maintaining the high product quality level required for their medico products. This was achieved by the construction of their first production facility in the Hungarian city of Tatabánya. Ramboll acted as General Planner.

Kistefos Museum ”The twist”: Innovative approach in sculptural museum building

As the main consultant of the turnkey contractor, Ramboll has overseen the detailed project engineering of the Kistefos Museum. A close collaboration between Ramboll’s engineers, architects and architectural technologists internally, as well as with BIG and the turnkey contractor, Bladt, has rendered the project possible.

Main Sales Office and Service Centre for Grundfos

In the Bang Na district of Bangkok, Grundfos has cemented its already solid presence in Thailand by erecting a new main sales office and service centre. As one of the world’s leading pump manufacturers and an expanding company in need of additional space, Grundfos decided to build new facilities in Bangkok. Ramboll was assigned as General Planner.

Extension to Production Facility for Grundfos

Due to an overwhelming success in the Chinese market, the world's leading pump manufacturer Grundfos decided to extend their Suzhou production facility from 2005. With the extension completed late 2008, the facility totalled 48,000 sq.m., making it the company's largest production facility worldwide outside Denmark at the time of completion. Ramboll acted as General Planner on the project.

Production Facility for Grundfos

The desire to increase their range of distribution and to meet the increasing demand were the principal reasons behind Grundfos' decision to transfer their electric motor production from Bjerringbro in Denmark to Tatabánya in Hungary. In his inauguration speech, Niels Due Jensen, Chairman of Grundfos, said he was very pleased with the fact that not a single job was lost in connection with the transfer of motor production.Ramboll was assigned as General Planner.

Novo Nordisk A/S, OLP Launch Facility - Tablet Production

Rambøll Denmark A/S was appointed by Novo Nordisk A/S for the design of a new production facility which will deliver the world’s first protein tablet to the global market.

Greenfield Production Facility for Grundfos

As one of the fastest growing markets for Grundfos, the Istra Region near Moscow in Russia was the chosen location for the new production facilities of Grundfos, who is among the world leaders in pump manufacturing. The new factory would facilitate direct supply of efficient and energy-saving pumps to the craving Russian market. Ramboll acted as General Planner on the project.

Greenfield Production Facility for Grundfos

When a long-term subsupplier of Grundfos, who delivered electric motors to their submersible pumps in the USA, suddenly became a competitor by acquiring a small pump factory, Grundfos decided to realise a long-standing desire of the founders – a production facility in Mexico. The new factory forms an important part of the growth strategy for the North American market of Grundfos, one of the world's leading pump manufacturers. Ramboll was assigned as General Planner on the project.

Final Extension to Production Facility for Coloplast

When Coloplast decided to build the third and final extension to their production facility in Tatabánya, Hungary, Ramboll's proven expertise as turnkey consultants on production facility projects worldwide was the answer.

Greenfield Production Facility for Coloplast

The first medico production facility by Coloplast in China was placed in the city of Zhuhai in the Guangdong province of South China. With the 18,500 sq.m. production facility complete with offices, canteen and over 2,500 sq.m. of cleanroom facilities, Coloplast has underlined its presence in China. Ramboll was chosen as General Planner on the project.

First Extension to Production Facility for Coloplast

Increasing sales soon made Coloplast's first production facility in Hungary too small to cope with demands. As a result, Coloplast decided on an extension of the facility in Tatabánya and, based on the success of the first project for Coloplast in Hungary, Ramboll was selected as General Planner.

Modification of Coloplast Production Facility

After a successful start-up of their production facility in Nyírbátor in Eastern Hungary, Coloplast decided to modify and extend the facility in order to accommodate new production lines. Ramboll was selected as General Planner for the project.

Greenfield Production Facility for Coloplast

A combination of social and competitive aspects influenced Coloplast’s decision to place their fourth production facility in the city of Nyírbátor in Eastern Hungary. Ramboll was selected as General Planner for the entire project.

NN 1R Purification Pilot

Ramboll was appointed to deliver comprehensive technical advice and assistance in connection with a strategically important Purification Plant set up for Novo Nordisk in Copenhagen, Denmark. The plant will increase the capacity for the manufacturing of active diabetes medicines in line with the Novo Nordisk development programme.

Nordhavnsvej – the largest road construction project in Copenhagen in 50 years

The project for “Nordhavnsvej” is the first stage of a new road to Copenhagen’s Nordhavn (North Harbour). Nordhavn is an old industrial and port area, planned to be developed into a new urban area in the north-eastern part of Copenhagen. When fully developed, the urban area is planned for 40,000 residents and 40,000 workplaces.

Ramboll

Ramboll
First Floor, Emerald Building
Oud Metha Road
PO Box 116921, Dubai, UAE
Tel:+971 4 334 3616
Fax:+971 4 334 3617

Mail: info@ramboll.ae

Other sites

Other sites